Hangar Completion

Hangar Completion #8 (Stabilator fairing and final installation)

Total Build Time: 1209 Hours Up until this point, the rear stabilators have only been temporarily attached. This was mainly because I hadn’t yet made the fairing that joined them at the top and wanted to be able to remove them when fabricating this fairing. Well that time has finally come. Following advice from fellow … Continue reading »

Categories: Empennage, Hangar Completion, Waiex #197 | Leave a comment

Hangar Completion #7 (Finalizing Firewall Forward.)

Total Build Time: 1198 Hours This post details most of the final details and preparations that allow me to say the following: the engine is ready to fly.  To summarize, I’ve performed my initial ignition and fuel test runs, made my final cutouts and adjustments to the cowling and baffles, and made some small tweaks to … Continue reading »

Categories: Engine Cowling, Hangar Completion, Turbo Aerovee Engine, Waiex #197 | Leave a comment

Hangar Completion #6 (Push to Talk (PTT) switches, Compass and Elevator Trim)

Total Build Time: 1194 Hours. This post has several small items in the cockpit that I finalized. First are the push-to-talk switches installed on my control sticks. This is the little button that’s pushed to transmit over the radio. I began by removing the control sticks from the aircraft and drilling a small hole in … Continue reading »

Categories: Electrical, Fuel, Misc, Hangar Completion, Waiex #197 | Leave a comment

Hangar Competion #5 (Throttle and Air Filter)

Total Build Time: 1180 Hours I’ll start this post by just saying that as the aircraft build reaches its final stages, there are a plethora of details that have to be addressed. Some issues I’ve solved recently: -Both of the magnetrons provided in my engine kit were faulty, in the sense that they could not … Continue reading »

Categories: Firewall Forward, Hangar Completion, Turbo Aerovee Engine, Waiex #197 | Leave a comment

Hangar Completion #4 (First start and taxi)

Total Build Time: 1150 Hours. This post marks a huge milestone in my build… the Aerovee engine kit which I assembled earlier this year actually started!  I’ll post some videos and pictures of the event here, then follow up with my experience and lessons learned at the end of the post below. Video of first … Continue reading »

Categories: Firewall Forward, Hangar Completion, Turbo Aerovee Engine, Waiex #197 | Leave a comment

Hangar Completion #3 (oil, throttle, mixture)

Total build time: 1140 Hours. One of my last tasks before cranking my engine for the first time was to install the oil lines to the turbocharger.  This consisted of several lines of metal tubing along with some flexible hose lines.   Once the oil lines were run, I filled the oil sump with oil and … Continue reading »

Categories: Firewall Forward, Hangar Completion, Turbo Aerovee Engine, Waiex #197 | 2 Comments

Hangar Completion #2: (Engine Baffles)

Total Build Time: 1130 Hours. The engine baffles took me far more time to complete than I expected (about 30 hours.) My primary concern when installing the baffles was to get a very tight seal between baffles and cowling in order to maximize cooling airflow over the cylinders and cylinder heads to keep engine temperatures … Continue reading »

Categories: Firewall Forward, Hangar Completion, Turbo Aerovee Engine, Waiex #197 | Leave a comment

Hangar Completion #1 (Exhaust and Turbo Installation)

Total Build Time: 1100 Hours. Installation of my exhaust mainfold and turbocharger began with “clocking” the turbo. Basically, orienting the 3 sections of the turbo housing correctly (the turbine section, center oil section, and the compressor section.) This required some heavy duty snap ring pliers. I had to file down the tips of the pliers … Continue reading »

Categories: Firewall Forward, Hangar Completion, Turbo Aerovee Engine, Waiex #197 | Leave a comment

Time-lapse Video, 900 hours of work and move to airport.

This video includes all the time-lapse footage I have from January 2014 until August 2015. It’s essentially the entire build of the airframe. It’s missing the first 200 hours of the project because I didn’t have the camera setup for that portion of the build.

Categories: Aft Fuselage, Delivery and Workshop, Electrical, Fuel, Misc, Empennage, Engine Cowling, Firewall Forward, Flaps and Ailerons, Forward Fuselage, Fuselage, Fuselage Completion, Hangar Completion, Main Wings, Turbo Aerovee Engine, Videos, Waiex #197, Wing Spars, Wings | Leave a comment